Specifications include, but are not limited to: 0005 204001-000 MOBILIZATION LUMP SUM _________._____LUMP SUM 0010 207001-001 UNCLASSIFIED EXCAVATION CY 186.000 _________._____ _________._____ 0015 211001-000 UNCLASSIFIED BORROW EXCAVATION CY 149.000 _________._____ _________._____ 0020 408002-001 ASPHALT MATERIAL GA 56.000 _________._____ _________._____ 0025 415005-001 STANDARD MILLING SY 172.000 _________._____ _________._____ 0030 607001-001 TYPE 1 GUARDRAIL, CLASS 1, 28.5" LF 137.500 _________._____ _________._____ 0035 607025-001 CUT SLOPE TERMINAL, TYPE A EA 1.000 _________._____ _________._____ 0040 607066-001 TANGENT END TERMINAL EA 3.000 _________._____ _________._____ 0045 636005-001 TEMPORARY STRUCTURE FOR MAINTAINING TRAFFIC LUMP SUM _________._____LUMP SUM 0050 636008-011 TEMPORARY PAVEMENT MARKING- PAINT 8 IN LF 48.000 _________._____ _________._____ 0055 636011-001 TRAFFIC CONTROL DEVICE UN 3,460.000 _________._____ _________._____ 0060 636014-001 FLAGGER HR 200.000