Specifications include, but are not limited to: • Remove existing roof down to decking and dispose of safely and properly • Mechanically fasten (2) layers 3.5” Polyiso or equal to achieve Vermont code of R-40 • Mechanically attach .060 TPO Membrane using the induction weld system • Add any necessary blocking for new insulation heights • Flash any drains or penetrations per manufacturers specs • Fabricate and install 24 gauge kynar or equal coated perimeter edge metal • Clean and leave job site in a professional manner • All areas need to be verified by the proposer; • Remove existing roofing materials and properly dispose, as needed; • Removal and disposal of all waste materials; • All communication, scheduling and coordination with BTV; • Mechanically attached 1” Polyiso or equal over existing roof • Mechanically attach .060 TPO Membrane using the induction weld system • Flash any drains or penetrations per manufacturers specs • Fabricate and install 24 gauge kynar or equal coated perimeter edge metal • Clean and leave job site in a professional manner • All areas need to be verified by the proposer; • Remove existing roofing materials and properly dispose, as needed; • Removal and disposal of all waste materials;