Specifications include, but are not limited to: BLANKET REQUIREMENTS: 01/01/2022 - 12/31/2024 | | This is a full maintenance contract to include systematic maintenance, inspection, parts | and all safety tests on the list of approximately seventy-six(76) elevators and nine(9) | wheel-chair lifts located in various buildings on the Kingston Campus, Narragansett Bay Campus, | Alton Jones Campus and CCE-Providence Campus of the University of Rhode Island. | | Extent of Coverage | Regularly and systematically examine, adjust, lubricate, and do whenever is required as the | result of wear and tear of normal elevator usage. Repair or replace the equipment only using | trained personnel directly employed and supervised by you to maintain the equipment | in operating condition and in full complieance with the State of Rhode Island Law.