Specifications include, but are not limited to: The solution will provide installation of uninterruptible power supplies with an Enterprise interface (single), monitoring, and alert capabilities.; The UPS’s must provide 15 minutes or more of run time based on 60% load The City has a four post 48 U rack, which the equipment must fit in. The proposer should evaluate the site access and delivery options and propose systems that can be delivered and installed without requiring any modifications to building access. The solution should have the capabilities of sending alerts and have a management interface to setting up those alerts. Alerts such as: bad battery, load capacity, battery on, etc The UPS solution should be easily expandable for the need of future growth. The proposer will need to inspect the panel and outlets to gauge if any new circuits or consolidations will need to be added. The proposer will need to hand in drawings and plans showing the design of the solution Proposer must finish the project with in a 3-month period from the time the project has started to finish.