Specifications include, but are not limited to: A. Project Identification: Interior Fit-Out for RI Department of corrections, RI Office of the Attorney General Customer Service Center, Pastore Center, 4 Howard Avenue, Cranston, Rhode Island. B. Sustainable Design Intent: The building within which these renovations are occurring has met the requirements and procedures for compliance with the US Green Building Council’s (USGBC) Leadership in Energy and Environmental Design (LEED) prerequisites and credits needed to obtain certification based on LEED Green Building Design and Construction, 2009 Edition, LEED for New Construction – Gold Certification. Refer to Section 018110, SUSTAINABLE DESIGN REQUIREMENTS for requirements to ensure any new construction meets the minimum sustainable criteria for conformance with LEED requirements. C. Project Requirements for Temporary Utilities and Facilities: 1. Utility Costs: The Contractor shall meter and pay for cost of utility services consumed, including electricity, water, gas and temporary heat. 2. Toilet Facilities: The Contractor shall provide and maintain temporary toilets outside the building.