Specifications include, but are not limited to: Contractor shall upgrade the existing fence by installing chain links and razor wire. B. SYNOPSIS • Remove all overgrown vegetation that is within three (3) feet of the CHP property line. • Remove approximately one thousand (1000) feet of existing • Install single coil concentration razor wire on top of brick wall surrounding the perimeter of the facility with no gaps. • The Contractor must verify all measurements encompassed in this project and is solely responsible for their accuracy. C. SITE PREPRATON AND CLEAN UP • The Contractor shall keep the work site clean, and haul away any work site debris. All removed material must be recycled where possible. • The Contractor shall maintain a safe working environment to prevent injuries to CHP personnel or damage to CHP property. • The Contractor, at no expense to the State of California, will repair any damage caused by the Contractor or any of his/her workers.