Specifications include, but are not limited to: 1. Condition Assessment: • Review available construction documents and interview knowledgeable parties • Site survey to observe and document existing roof construction and potential project issues that will need to be addressed in design development, to include adequate flashing heights and detail conditions, MEP impacts, etc. 2. Design Development/Construction Drawings and Specifications: • Prepare a roof plan and necessary roofing detail. • Perform ASCE 7-10 wind uplift calculations to determine attachment criteria of new roofing system. Confer with AFM Insurance, the Authority’s carrier, to ensure all their standards for design are met. • Perform roof drainage calculations and general code review • Review MEP conditions for modification and or engineering requirements • Produce roof replacement drawings and technical specifications to be used for bidding and construction, including keynotes with typical and project-specific details. Standard AIA front end and contract docs to be used. • Review the design document progress and bid package with the Client at 95% complete, incorporating revisions • Issue a final 100% project bid package, including project manual and design drawings • Coordination meeting – assume one meeting and one conference call during the Design Phase • Assist the Rhode Island Convention Center Authority with the selection of a Construction Manager.