Specifications include, but are not limited to: The selected firm will perform the design and plan development work necessary to produce the construction contract documents. The selected firm will be required to provide an Engineering Assessment Report, Environmental Documentation, Road Design, Bridge Rehabilitation Design, Geotechnical Services, Pavement Design, all Permits (if needed), Topographic Survey, Utility Coordination, Hydraulic Analysis and Design, Right of Way Plan Development (including Abstracting, R/W Engineering and R/W Staking, as needed), and Construction Phase Services. The Selected Firm will provide Real Estate Acquisition Services (as needed). The selected consultant's fee proposal shall be due 45 calendar days after the selection date for this RFP item. These contracts will utilize the INDOT eInvoice application.