Specifications include, but are not limited to: 401502-20 ASPHALT CEMENT COST ADJUSTMENT 401699-20 QUALITY CONTROL/QUALITY ASSURANCE OF BITUMINOUS CONCRETE 705504-20 BRICK ANS/OR BLOCK SIDEWALK 763501-20 CONSTRUCTION ENGINEERING 763502-20 SITE FURNISHING 763504-20 SITE WORK 763511-20 ADMISTRATION BUILDING 763598-20 FIELD OFFICE, SPECIAL I 831513-20 FURNISH AND INSTALL 2" SCHEDULE 80 PVC CONDUIT (TRENCH) 831515-20 FURNISH AND INSTALL 3" SCHEDULE 80 PVC CONDUIT (TRENCH) 831516-20 FURNISH AND INSTALL 4" SCHEDULE 80 PVC CONDUIT (TRENCH) 831523-20 FURNISH AND INSTALL 2" GALVANIZED STEEL CONDUIT (TRENCH) 831545-20 FURNISH AND INSTALL 4" HDPE SDR-13.5 CONDUIT (BORE) 831561-20 FURNISH AND INSTALL 1-1/2" SCHEDULE 80 PVC CONDUIT (TRENCH) 911509-20 MULCHING