Specifications include, but are not limited to: (2) Stormwater – the selected team shall integrate Green Stormwater Infrastructure (GSI) concepts into the elements included in the project area. If a stormwater permit is required, the selected team shall integrate GSI concepts into the permitted system. (3) All elements of design will be in accordance with the U.S. EPA Dark Sky program guidelines as applicable. (4) All mechanical and electrical components of design will use Energy Star products as applicable. (5) Address unique subsurface conditions during the design of any foundation or supporting structures. (6) The design and the siting of any facilities/structures and parking shall take into consideration the natural resources of the property; soils; envisioned uses of the property; the land use history of the property; the impact on the landscape, visual resources and the character of the site and area. (7) All utilities shall be buried (8) All program elements and facilities at Lake St Catherine State Park shall be developed for an April –November camping season and be developed and/or improved in accordance with the Americans with Disabilities Act (ADA) and including those elements within the Americans with Disabilities Act Accessibility Guidelines (ADAAG) for recreational facilities, as appropriate. (9) Development of a site survey for select areas within the site plan. (10) All applicable life safety, utility and health codes must be met. (11) Local building materials, including those harvested on site shall be incorporated into renovations and new construction whenever possible.