Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207001-001 UNCLASSIFIED EXCAVATION CY 193.000 _________._____ _________._____ 0020 207002-000 SUBGRADE CY 362.000 _________._____ _________._____ 0025 207034-000 FABRIC FOR SEPARATION SY 723.000 _________._____ _________._____ 0030 211001-000 UNCLASSIFIED BORROW EXCAVATION CY 219.000 _________._____ _________._____ 0035 307001-000 AGGREGATE BASE COURSE, CLASS I CY 136.000 _________._____ _________._____ 0040 403001-001 CRACK SEALING IN ASPHALT PAVEMENT LF 542.000 _________._____ _________._____ 0045 408002-001 ASPHALT MATERIAL GA 130.000 _________._____ _________._____ 0050 415005-001 STANDARD MILLING SY 1,297.000 _________._____ _________._____ 0055 607001-001 TYPE 1 GUARDRAIL, CLASS I LF 162.000 _________._____ _________._____ 0060 607005-001 TYPE 5 GUARDRAIL, CLASS V LF 25.000 _________._____ _________._____