Specifications include, but are not limited to: Clear and remove all overgrown vegetation that is within 5 feet of fence line. B. Furnish and install new barb arms to the current fence. Arms will be a maximum of 10' apart. At terminal points, wire will be fastened to the fence. All touch up will be done with a rust proof primer. C. Three strands of 4-point barbed wire will be stretched over the existing fence. Barbed wire will also be stretched over large roll gates in the same fashion. D. Maintain a safe working environment to prevent injuries to CHP personnel or damage to CHP property. E. At no expense to the State of California, will repair any damage caused by the Contractor or any of his/her workers. F. Must field verify any and all measurements encompassed in this project and is solely responsible for their accuracy. G. Ensure that the back-parking lot is secured at the end of each construction day to prevent intruders from entering into the facility grounds.