Specifications include, but are not limited to: • Perform pre-demolition asbestos containing material survey per NHDES requirements • If any asbestos containing materials are uncovered during the pre-demolition survey, the Contractor shall submit a change order to remove and properly dispose of those materials. The City will have the option to approve that change order or contract separately to have those materials removed and disposed of prior to demolition. • Verify Utility disconnects • Notify Dig Safe • Site Equipment and dump containers • Demolish and remove all above ground buildings, appurtenances, garbage and debris. • Any and all building contents, if any, become the property of the contractor, with salvage value to be a consideration in the bid price. • Contractor must have adequate on site dust control and erosion measures in place. • Remove existing foundation to minimum two feet below grade. • Fill (must be non-hazardous materials), grade, loam and seed all disturbed areas. • Remove overgrowth on the parcel • Maintain Protection of adjacent structures, utilities and properties • Maintain Protection of vehicular traffic and pedestrians • Contractor must ensure adequate access to adjacent properties