Specifications include, but are not limited to: Initial contractual services will be for the interpretive planning, design and production needs of the following projects: 2.1 Research, content development, graphic design of interpretive elements as defined per project below: • 2.1.1 Sign production, pedestals, stands, display tables and/or cabinets as defined by the projects below; and 2.1.2 Interpretive related items as defined by the projects below, for example: large format photographic displays, electronic interpretive message boards, interpretive models, and/or display equipment. 2.1.2.1 Spooner Frontcountry Improvements Phase 1: Eight (8) 36x48 inch interpretive signs and outdoor pedestals. Two (2) 48x36 inch 3-dimentional terrain models and outdoor display tables. Work elements will be defined by the Spooner Lake Front Country Interpretive Brief, dated April 2, 2021. NDSP will supply research assistance and historic photos.