Specifications include, but are not limited to: Steam cleaning services will be provided on a semi-annual basis and will be arranged with the On-Site Contact, in order to minimize disruption to CHP operations. A. Access to water for use by Contractor will be made available by the CHP. B. Contractor shall check-in and check-out with the On-Site Contact person or designee upon each service to provide verification the service has been provided to the satisfaction of the On-Site Contact or designee. C. Routine service to be performed semi-annually. Contractor shall notify the On-Site Contact of the date and time the service is to be performed one (1) week prior to the actual work. D. Contractor must respond to miscellaneous service call-outs within twenty-four (24) hours of notification. E. Contractor shall steam clean the concrete portions of the roadway/parking lot surfaces located at the facility (including the concrete platform scale surface) and the floors of the inspection bays. Additionally, at facilities where pit inspection lanes are used, Contractor shall steam clean floors, walls, and covers of the pits.;