Specifications include, but are not limited to: SCB-1800 W/BH-18” Shot-blasting with Head Attachment or Equal; 3.1 The unit shall arrive at the prescribed delivery point having been completely pre-serviced with oil, lubricants, coolant, and tire pressure; with all equipment completely assembled, installed and operating as designed; and all required adjustments and corrections made to make the unit immediately ready for its designed and continuous operation. All prescribed precautions pertaining to first operations and break-in of the unit shall be posted conspicuously on the unit for ready observance by the operator. 3.2 Upon delivery, the Authority will perform a complete inspection of the unit to assure that it meets the Authority’s specifications or accepted alternatives. Final processing for payment may not be initiated until the unit is certified to meet specifications and the operator’s, service, shop, maintenance, and parts manuals and the application for Certificates of Title are received.