Specifications include, but are not limited to: The project generally consists of roadway and drainage improvements, including removals, grading, asphalt concrete (AC) paving, aggregate base course (ABC), curb and gutter, sidewalk, sidewalk ramps, storm drain pipes, decomposed granite (DG), retention basins, rip-rap, pavement marking and street lights. Most of the existing roadway surface will be completely replaced to its full depth with a new pavement section stabilized by a Geogrid Reinforcement. A portion of the existing roadway surface between Santa Cruz Boulevard and Battaglia Road will be milled and overlayed with new AC pavement. Curb and gutter will be added for the entire length of the project on both sides of the road. A new 8-foot sidewalk will also be constructed with the new improvements on the west side of the road only