Specifications include, but are not limited to: E. Install level 3 bullet resistant woven fiberglass panels on front side of countertop to bottom and cut to fit. Remove window on west wall. Build back wall and install level 3 ballistic woven fiberglass panels to cover entire wall area and pain to match, as per plans and specifications. F. Install 1-steel pass-through deal tray at the opening in glass cutout per photos. G. Supply power from under the counter to the speaker, as per plans and specifications. H. Furnish all new framing materials to support the glass panels and door as per plans and specifications. I. Contractor will ensure that the work area is kept clean and free of debris, as necessary, to maintain a safe working environment for staff. All debris, trash and packaging are to be disposed of off-site daily. J. Ensure all framing members are attached to the roof structure above the suspended ceiling for structural support of the new wall panels, and door, as per plans and specifications.