Specifications include, but are not limited to: 1 Mobilization, Demobilization and Clean-Up 1 LS 2 Clearing, Grubbing, Demo Including Asphalt, PCC, Trees, Bushes, Benches, Fence and Solar Panel 1 LS 3 Construct PCC curb 85 LF 4 Construct PCC sidewalk 650 SF 5 Construct PCC driveway apron 235 SF 6 Construct 3” on 6” AC Parking Lot 2360 SF 7 Permanent AC Pavement Patch 80 SF 8 Electrical Conduit, 1.5” 280 LF 9 Conduit Sleeve, 4” 10 LF 10 Post-Tensioned Concrete Slab with tennis net sleeves– Including Nevada Licensed Engineer Design 14513 SF 11 10’ Chainlink Fence and Fabric in PostTension Slab – Including Nevada Licensed Engineer Design 565 LF 12 4’ Boulders 16 EA 13 4” Minus Rock 320 SF 14 Benches 2 EA 15 Acrylic Tennis Court Surfacing 14513 SF 16 Parking Lot and Court Striping 1 LS 17 Signs 2 EA