Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM _________._____LUMP SUM 0010 204001-000 MOBILIZATION LUMP SUM _________._____LUMP SUM 0015 207001-001 UNCLASSIFIED EXCAVATION CY 111,485.000 _________._____ _________._____ 0020 207002-000 SUBGRADE CY 3,498.000 _________._____ _________._____ 0025 207034-000 FABRIC FOR SEPARATION SY 25,584.000 _________._____ _________._____ 0030 211001-000 UNCLASSIFIED BORROW EXCAVATION CY 39,638.000 _________._____ _________._____ 0035 211002-000 ROCK BORROW EXCAVATION CY 2,626.000 _________._____ _________._____ 0040 218001-000 RIPRAP CY 577.000 _________._____ _________._____ 0045 219001-001 CONTROLLED LOW STRENGTH MATERIAL, TYPE B CY 6.000 _________._____ _________._____ 0050 240001-000 CLEAN CULVERT LF 131.000 _________._____ _________._____ 0055 240002-000 CLEAN INLET EA 1.000 _________._____ _________._____ 0060 307001-000 AGGREGATE BASE COURSE, CLASS 3 CY 99.000