Specifications include, but are not limited to: Work Item List 1. Dry docking. 2. Power wash/scrape hull. 3. Sea Chest, Sea Chest Valves, and Bilge, Ballast, and Fire Manifold Valves 4. Zincs. 5. Hull Preparation and Coating 6. Rudder Removal, Inspection and Installation 7. Shafts Removal, Inspection and Installation 8. Propeller Hub and Blade Removal, Inspection, Installation, and Repacking 9. Propeller Shaft Cutlass Rubber Bearing Replacement 10. Ultrasound Hull, Cooling Lines & Aft Fuel Lines 11. Install WASSP 160KHZ Transducer 12. Install New Anchor Chain and Cable 13. Inspect Wagner Hydraulic Steering System 14. New Shaft RPM & Pitch Gauges 15. Inspect/Calibrate PLC System 16. Paint Saltwater Sea Chests in Engine Room