Specifications include, but are not limited to: 1. Design: Create construction-ready drawings stamped by a Structural or Civil Engineer certified to work in the State of Vermont for the installation of a gangway lift system for the A, C, and D Docks at the Burlington Boathouse Marina. a. System shall consist of pilings with columns and support bracing to hold a lift system capable of raising and lowering existing gangways at the Boathouse Marina. b. Drawings must indicate final layout, location and details for any required pilings, lift systems, section details, materials and methods for fabrication, all material finishes, and load calculations. 2. Construction; a. Coordinate all equipment, materials, fabrication, installation and labor to install the gangway-lift system as called out per the City-approved plans from Task 1; b. Work with BPRW Staff to identify and approve a materials and equipment staging area. c. Remain in communication with BPRW’s designated project manager throughout the course of the project, regarding work status, timeline, signage, and any other information deemed necessary for the success of the project.