Specifications include, but are not limited to: Scheduled and unscheduled work may include tasks such as lifting loads in excess of 30 pounds, bending squatting, crawling, painting, digging, working on ladders, operating hand tools, moving furniture, or equipment, working with maintenance chemicals such as paints and cleaning solvents, or working in inclement weather. 3.5.6 Floor Care: The offeror shall quote the cost per square foot for unscheduled floor care that might be necessary and is not included as part of the scheduled cleaning requirements in Section 4.0 of the RFP. 3.5.7 During the term of this contract, it is possible that the configuration of the facility will change, either by some modification of existing space or by the construction of additional space. To allow for continuation of the contract, under either circumstance, and to provide a means for determining the adjustment to the contract pricing, Offeror shall state a Deduction/Addition Cost per square foot in Section 6.7.1 of Proposal Response Format. The cost of the increase/decrease of the contracted total daily scheduled work will be calculated based on this rate and actual square footage of the addition or deletion.