Specifications include, but are not limited to: Currently there is a stormwater pond and associated permit at the site to treat water from The Health Center and its parking lot. However, the gully developed historically and continues to head cut up gradient and contribute to sediment loading into the Winooski River. There currently are two stormwater outlets into the gully: one from The Health Center stormwater pond and one from Route 2 drainage. The design solution for the stormwater treatment is to temporarily store stormwater, remove sediment, and slow velocities of stormwater flow in a regraded stormwater settling area and rock berm as well as stabilization of the gully. The access to the gully area and grading of the side slopes is difficult so a settling area will help to slow flow velocities and capture sediment prior to enter the gully. This will enable easier operations and maintenance in the future.