Specifications include, but are not limited to: 1. The Alaska Railroad Corporation (ARRC) is seeking quotes for the labor and materials to install new service to Building #6 from building #272. Currently Building #6 is being feed from a 2400 volt service feed from Chugach Electric.3. Contractor will need to run new wire and conduit from building #27 MDP to the MDP at building #6 4. Install a new transformer at Building #6.5. Contractor will need to work between the hours of 4:00 P.M. and 12:00 A.M.6. When digging the trench, it will need to be back filled the same day it was trenched.7. Asphalt needs to be completed no later than ten days after the trench work was completed.8. Contractor will need to furnish generators for building #6 and warehouse #1 while Contractor are doing the cut over.9. Contractor will get all utility locates.10.Contractor will be responsible for the removal and disposal of the old transformers.11.Contractor will be reasonable working with Chugach Electric in the disconnecting from there grid.12.Contractor will need to summit all final draws to the Alaska Railroad after completion of job.13.All work will be done no later than Oct. 1, 2021