Specifications include, but are not limited to: This federally funded contract includes the rehabilitation of two airports located Northeast of Dillingham along the Nushagak River. Project CFAPT00292 is located at the Ekwok Airport and Project CFAPT00871 is located at the New Stuyahok Airport. Both projects include the resurfacing of existing runway, taxiway and apron operating surfaces and the re-establishment of embankment crowns and grades to meet applicable FAA standards. Additional improvements include replacement of runway and taxiway lighting, replacement of existing wind cones, rotating beacons, and aircraft tie-downs, drainage improvements, brush clearing, slope stabilization, and application of a dust palliative. 10 D760.040.0000 Thaw Wire Installation 1 Each 20 G100.010.0000 Mobilization and Demobilization All Required Lump Sum Lump Sum 30 G115.010.0000 Worker Meals and Lodging, or Per Diem All Required Lump Sum Lump Sum 40 G130.010.0000 Field Office All Required Lump Sum Lump Sum 50 G130.020.0000 Field Laboratory All Required Lump Sum Lump Sum 60 G130.040.0000 Meal 630 Each 70 G130.050.0000 Lodging 210 Each 80 G130.060.0000 Nuclear Testing Equipment Storage Shed 1 Each 90 G130.090.0000 Engineering Communications All Required Contingent Sum Contingent Sum $10,000.00 100 G131.010.0000 Engineering Transportation (Truck) 2 Each 110 G131.025.0000 Engineering Transportation (UTV) 1 Each Construction Surveying by the Contractor 120 G135.010.0000 All Required Lump Sum Lump Sum 130 G135.020.0000 Extra Three Person Survey Party 60 Hour 140 G135.050.0000 Contractor Furnished Engineering Tools All Required Contingent Sum Contingent Sum $45,000.00 Equipment Rental, Dozer 70-hp Minimum 150 G150.010.0070 50 Hour 160 G300.010.0000 CPM Scheduling All Required Lump Sum Lump Sum 170 G700.010.0000 Airport Flagger All Required Contingent Sum Contingent Sum $65,000.00