Specifications include, but are not limited to: construction of a parking lot, demolition of existing AC pavement, aggregate base, scarification, new base compacted to requirement, and installation of new AC pavement. Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: Demolition of existing AC pavement, aggregate base, bumper blocks, haul and disposal, remove and reinstall valves, pull boxes, and manholes, earthwork, over excavate, reprocess material, haul, place, compact, import new structural fill, Asphaltic concrete paving, selective curb replacement, striping, signage, pavement markings, bumper block replacement; construction of a parking lot, demolition of existing AC pavement, aggregate base, scarification, new base compacted to requirement, and installation of new AC pavement. Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: Demolition of existing AC pavement, aggregate base, bumper blocks, haul and disposal, remove and reinstall valves, pull boxes, and manholes, earthwork, overexcavate, reprocess material, haul, place, compact, import new structural fill, Asphaltic concrete paving, selective curb replacement, striping, signage, pavement markings, bumper block replacement.