Specifications include, but are not limited to: The work generally consists of: 1. Schedule 1 – E Street West: The work of this schedule generally consists of approximately 540 LF of 8-inch SDR35 PVC opencut sewer main replacement, three eccentric manholes, 16 Sewer service reconnections, asphalt surface restoration, and other appurtenances. 2. Schedule 2 – D Street West: The work of this schedule generally consists of approximately 1,750 LF of 10-inch SDR35 PVC opencut sewer main replacement, seven eccentric manholes, 47 Sewer service reconnections, asphalt surface restoration, and other appurtenances. 3. Schedule 3 – B Street West: The work of this schedule generally consists of approximately 1,780 LF of 8-inch SDR35 PVC opencut sewer main replacement, seven eccentric manholes, approximately 36 Sewer service reconnections, asphalt surface restoration, and other appurtenances. 4. Schedule 4 – Sewer Main Siphon & Diversion Structure The work of this schedule generally consists of three – 500-foot-long inverted siphons beneath the BNSF Railroad Tracks. Also included in this schedule is a cast in place siphon inlet diversion structure, and a discharge structure