Specifications include, but are not limited to: Demo existing partition walls, heating, HVAC, electrical fixtures, fire sprinkler heads, fire alarm notification devices, as needed and install with new. Any existing material capable of being re-used, must be specified in the bid spec. B. Frame new walls and ready for mechanicals. C. Install drywall, prime and paint two coats on walls. D. Install and add new solid core composite doors with new hardware and trim, prime and paint with two coats of paint. E. Remove existing suspended ceiling as needed and replace new suspended ceiling to match as close as possible to existing tiles. F. Remove existing VCT flooring and install with new VCT flooring in disturbed areas. G. Relocate existing HVAC duct work and provide additional HVAC duct to new areas where needed