Specifications include, but are not limited to: · Apron Construction includes 1,900 SY of P-501 Cement Concrete Pavement and 27,100 SY of P-401 Asphalt Mix Pavement and associated P-209 Base Course, P-152 Embankment, P-152 Excavation, airfield lighting, striping, signage and 1,400 LF of D-701 storm drain improvements. · Apron Access Roads Construction includes 1,400 LF of 28’ wide and 400 LF of 24’ wide roads constructed of P-403 Asphalt Mix Pavement and associated P-208 Base Course, P-152 Embankment, P-152 Excavation, streetlights, striping, signage, and storm drainage. · Service Road Construction includes new construction of 4,700 LF of 14’ wide road with P-403 Asphalt Mix Pavement and associated P-208 Base Course, P-152 Embankment, P-152 Excavation. Overlay includes 3,300 LF of 22’ wide road with P-403 Asphalt Mix Pavement. · Security Fence Construction includes installation of 4,300 LF of Airport Security Fence, 24’ Electric vertical pivot gate and associated equipment. · Access Control Equipment includes installation of 3,700 LF of Communication Wire and associated cameras, conduit, and hand holes. This work is to include all tools, equipment, materials and labor to complete this project.