Specifications include, but are not limited to: (Site Preparation has been completed by the Town: Removal and offsite disposal of all existing fencing, net posts, center straps and footings. Removal and offsite disposal of existing asphalt courts.) Site Drawings for Tennis Courts - Contractor will review site and have detailed plans and site drawings. Court Orientation - The new court must be rotated 90 from its current orientation for proper north/south orientation. Grading - Laser grade and compact base. Furnish and supply any additional processed stone needed for laser grading entire area to establish proper pitch per USTA guidelines. Net Posts - Furnish and install (2) new sets of net post footings and center anchors for north/south orientation. Include adjustable net system. Fencing- Furnish and install 456 LF of 10’ high vinyl wire. Top rail, middle corner bracing, and bottom tension wire included. Post Tension Concrete Form work will be installed around the entire perimeter of the tennis courts. New net post sleeves to be set in own concrete footings. Two layers of 6 mil polyethylene vapor barrier will be placed over the entire court area. Encapsulated post-tensioning tendons will be laid out according to PTI specifications. Surface Coating System: Acid Etch & Pressure Wash: Contractor will prepare the concrete surface with a cement slurry coat and acid wash. Acrylic Color Coatings: Furnish and install the (2) coat acrylic color coating surface system to entire area.