Specifications include, but are not limited to: The project consists of five schedules. Schedule One consists of replacement of approximately 800 lineal feet of water main and water services, as well as the installation of valves and fire hydrants. Schedule Two consists of Construction of approximately 1435 lineal feet of new sewer main and manholes. Schedule Three consists of replacing approximately 2200 lineal feet of water main and water services, as well as the installation of valves and fire hydrants. Schedule Four consists of replacing approximately 670 lineal feet of water main and water services, as well as the installation of valves and fire hydrants. Schedule 5 consists of replacement of a pressure reducing system, as well as replacement of approximately 500 lineal feet of water main and water services, as well as the installation of valves and fire hydrants.