Specifications include, but are not limited to: Dispose and remove the entire brush pile at the Transfer Station located at 101-129 Shannon Rd, Salem NH 03079. The existing brush pile is to be chipped and/or hauled off site for disposal. In addition, the existing chip pile is to be hauled off site for disposal as well. • Contractor will remove within 3-4 weeks from date of award. The contractor is expected to remove the pile including any additional brush added after the date of the walkthrough/viewing. The entire pile up until contractor is ready to mobilize the removal of the pile must be removed. • Contractor will be provided a lay down area behind the pile for the purposes of chipping and/or loading material to be hauled off site. • Contractor’s processing operation shall not interfere with the daily operation of the area for residents to dispose of brush. • Foreign items to be found in pile such as metal, trash, etc. can be deposited in the respectable areas of the transfer station. However, the remainder of the pile must be removed. All old wood, dirty wood, stumps, dirt, duff, etc. is to be hauled off and area left clean to start a new pile. • Contractor is to accept all brush as part of the awarded bid until operation is complete at the proposed bid price. • Access outside normal operating business hours can be arranged within reason. • The pile can be viewed and assessed at any time of normal business hours up until time of submittal.