Specifications include, but are not limited to:. The Work consists of performing or providing all labor, services, and documentation necessary to produce such construction and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. The Work generally includes but is not limited to: Installation of approximately 5,000 lineal feet of 10-inch AWWA C900 water line, approximately 1,500 lineal feet of 2-inch water service, approximately 240 lineal feet of 1-inch water service, ten 10-inch gate valves, and two fire hydrants. The purpose of this project is to provide potable water supply to maintenance facility buildings at the City of Fernley's East Wastewater Treatment Plant.