Specifications include, but are not limited to: The installation of approximately 1,900 ft of 6-inch C900 raw water transmission. All work shall be completed in accordance with the contract documents. All work will be completed within existing utility easements and Carlin Bay Property Owners Association right of way. Add Alternate 1: Directional drilling approximately 110 ft of 8” HDPE casing pipe under Highway 97, then sliplining the casing pipe with 6” HDPE waterline. All work shall be completed in accordance with the contract documents and ITD encroachment permitting requirements. Add Alternate 2: Complete two tie-ins between the new raw water transmission piping and the existing 5” steel raw water transmission per the project plans.