Specifications include, but are not limited to: Work will include (but not to be limited to) hood and transport velocity, general I conditions of the system (hood, ducts, fan system, radon system and associated | equipment) and identify recommended repairs, including cost estimates. Fume hoods | are to be certified OSHA testing and repair according to all required State and Federal | Regulations and requirements. (See Chemical Fume Hood Test Specifications below). | | All hoods tested are to be documented and a survey summary is to be provided to | the Assistant Director of Facilities Services, Maintenance and Repair. The summary | should include the following (in an excel spreadsheet): and be provided yearly: | - Campus | - Date | - Building | - Room | - Sash Parameters | - Measured Face Velocities in FPM (feet per minute) at the following locations: | - Upper Left | - Upper Middle | - Upper Right | - Lower Left I - Lower Middle | - Lower Right