Specifications include, but are not limited to: P1 Quarterly Maintenance Inspection 3 EA - Each Provide labor and material to perform (3) quarterly maintenance inspections and (1) annual inspection on (6) A/C units L-1 A&M Business School CC3 • Check unit amp draws, temperatures, drains and coil condition and unit operation, replace filters • Clean evaporators 1 time per year, change belts 1 time per year if applicable • Provide written report and proposal for any repairs if needed • All work performed on straight time 7:00am to 3:30am P2 Annual Inspection 1 EA - Each Provide labor and material to perform (3) quarterly maintenance inspections and (1) annual inspection on (6) A/C units L-1 A&M Business School CC3 • Check unit amp draws, temperatures, drains and coil condition and unit operation, replace filters • Clean evaporators 1 time per year, change belts 1 time per year if applicable • Provide written report and proposal for any repairs if needed • All work performed on straight time 7:00am to 3:30am