Specifications include, but are not limited to: 1.All Deliveries will be made within 48 hours after receipt of order, regardless of method of delivery (tank wagon or motor transport). Weekends and holidays are NOT exempt from the stated delivery schedule and it’s understood that bidders are a 365-day delivery operation. 2.DELIVERY SLIP / BOL - All deliveries including tanker loads shall include a bill of lading and / or documentation to identify the type product left at each delivery. Delivery and load slips must be left at each delivery site. Failure to leave delivery documentation at each delivery site may result in delayed payments for said deliveries. 3.SPILLS/ OVERFILLS - Most underground tanks are equipped with 4" tight fill adapters. (Exception: above ground skid tanks.) Delivery trucks should be equipped with appropriate hardware to seal delivery-lines to prevent over-fills and/or spills. If a spill should occur during delivery or Vendor should deliver the wrong product to tanks, the Vendor assumes all responsibility and liability for spill, clean - up and/or cleaning of tank and the delivery driver will report the incident to onsite agency personnel immediately. 4.OVERFILLS - Delivery personnel shall unload product at a reasonable pace and rate to allow the flapper valve to perform its function. Over filling of the tank will require the Vendor to return to the site, pump out the overfill and clean out the manhole. All cost associated with correcting the overfill will be the Vendors sole responsibility. Violations of this requirement shall be reported to the State of New Hampshire Department of Environmental Services.5.The State reserves the right to make additions or deletions to the list of delivery points and to increase or decrease the estimated quantity of propane fuel, as it may deem necessary, during the contract period.