Specifications include, but are not limited to: This project shall consist of, but not be limited to, the construction of approximately 2.75 miles of a new minor arterial roadway, 0.7 miles of a new major collector roadway, a vehicular bridge, 6,800 LF of reinforced concrete box culvert, 14-footx 11-foot cast in place concrete box pedestrian tunnel, 11,100 LF of 18-inch to 72-inch reinforced concrete storm drain pipe, storm drain manholes, drop inlets, 450 CY of Rip Rap with filter fabric,9,300 LF of concrete curb and gutter, concrete sidewalk, concrete medians, 72-inch chain link fence, 11,000 LF of 24-inch DIP and 16-inch DIP potable water transmission pipeline and appurtenances, DIP cathodic protection system, fire hydrant assemblies, 4,500 LF of 8-inch to21-inch PVC sewer pipe and manholes, 145,000 SY of asphalt concrete pavement, UTACS, streetlights, streetlight conduits, pull boxes, utility vault and manhole adjustments, Type II aggregate base, permanent signing, striping, traffic signal system at Via Nobila and Via Inspirada,10,500 LF of 4-inch PVC fiber optic conduit and pull boxes, dust palliative, dust control, steel casings, air vacuum air release valves, direct bury gate valves with bypass, blow offs, 440,000CY of roadway excavation, landscape and irrigation modifications, traffic control, large electrical duct banks with concrete encasement, RS-94 electrical manholes, clearing and grubbing, trenching, hauling, disposal, various removals and various other improvements. This project located in the City of Henderson, Nevada.