Specifications include, but are not limited to: Project involves the Roof Replacement of the NLR Community Center Gymnasium with a 50 mil Fleece back PVC KEE or 60 mil PVC KEE with Temporary Roof, 1.5” Insulation with sumps to drains and scuppers, ¼” Densdeck Prime Cover Board and all incidental/associated materials for a complete Roof System; Removal of Existing Roof Materials 8,000SF: Smooth Built-Up Roof Sheets, Separation Felt and Durolast PVC fastened into Tectum Deck. ; Installation of New Roofing after Removal of all Existing Roofing & Metal Edges 8,000SF: Nail Sanded Base Sheet, Torch apply Temporary Roof, Adhere 1.5” Insulation with 8” Sumps to Drains and Scuppers, Adhere ¼” Densdeck Prime Cover Board and Adhere 50 mil Fleece Back PVC KEE or 60 mil PVC KEE.