Specifications include, but are not limited to: During actual testing, the controlling PC's display must show the following information pertinent to the test in progress: The monitor standard being used as the test basis. The make, model, type, and serial number of monitor being tested. The date and time of the beginning of the test. The Tester serial number and firmware version number. The test results of completed tests and title of the current test. The number of laps completed in the continuous testing mode. The number of tests failed. The Tester must perform the following pre-testing measures: Voltage self-test and timing self-test of the Tester to assure the accuracy of the test conditions and response measurement. Pre-test the CMU/MMU for the presence of incorrect return voltages that could damage the Tester. If these tests are not passed, the Tester must alert the operator and halt the testing process.