Specifications include, but are not limited to: 1. Provide all labor, materials and equipment to jet, mechanically router and clean any septic, sewer, or floor drainage line and pump and dispose of septic tank contents at each of the sixteen (16) maintenance, welcome center, and toll facilities during normal business hours. Should specific methods for cleaning specific drain pipes fall outside of the contractor's expertise, subcontractors may be used with a pass through labor cost and standard percentage mark-up on materials as specified in the compensation section as stated below. See the attached location list (Exhibit A). 2. Perform emergency repairs to the septic, sewer, or floor drainage line at each of the sixteen (16) maintenance, welcome center, and toll facilities, as directed by the DEPARTMENT. Upon notification of a deficiency, the CONTRACTOR shall respond to the DEPARTMENT by telephone to all service calls within one (1) hour of report of occurrence and the CONTRACTOR will respond to the affected site within twenty-four (24) hours and complete the repairs within forty-eight (48) hours of notification. 3. The CONTRACTOR shall coordinate with the Bureau of Turnpikes Maintenance Mechanic Foreman for jetting, mechanically routering and cleaning any septic, sewer, or floor drainage line as well as pumping and disposing of septic tank contents at each of the sixteen (16) maintenance, welcome center, and toll facilities during normal business hours, 7:00 am to 5:00 pm, Monday thru Friday, unless otherwise directed by the DEPARTMENT. 4. The CONTRACTOR shall make recommendations pertaining to the septic, sewer, or floor drainage line design that affects the ability of the building to meet the stated goals and objectives of all governing codes and standards and the authority having jurisdiction.