Specifications include, but are not limited to: Woodman Park Dr. Improvements Reclaim existing asphalt Remove & dispose of existing asphalt off site that reclaimer cannot reach. Add stone for a stabilized base and crushed gravel for shoulder leveling. Reset Granite curb (Approx.450lf) Remove & dispose of excess reclaim material, Fine grade & compact, Trim transition joints at existing pavement. Supply & install machine pave 19.0-mm binder at 2.0-in compacted, Supply & install machine pave 12.5-mm wearing course at 1.5-in compacted Install Retroreflective 4” line and pavement markings Front Parking Lot Full Depth Pavement Replacement Saw cut as required, Reclaim existing asphalt, Remove & dispose of existing asphalt off site that reclaimer cannot reach, Rough grade & compact, Adjust existing manholes & catch basins as required, Remove and dispose of excess reclaim material, Fine grade and compact, Trim transition joints at existing pavement (three entrances), Supply and install machine pave 19.0-mm binder at 2.0-in compacted, Supply and install machine pave 9.5-mm wearing course at 1.5-in compacted, Supply and install pavement markings per existing layout. Secondary Drive Improvements Saw cut as required, Reclaim existing asphalt, Remove & dispose of existing asphalt off site that reclaimer cannot reach, Rough grade & compact, Adjust existing manholes & catch basins as required, Remove and dispose of excess reclaim material, Fine grade and compact, Trim transition joints at existing pavement (three entrances), Supply and install machine pave 19.0-mm binder at 2.0-in compacted, Supply and install machine pave 9.5-mm wearing course at 1.5-in compacted, Supply and install pavement markings per existing layout.