Specifications include, but are not limited to: A. PREPARE AREA BY COVERING BLEACHERS AND BANNERS WITH TARPS OR PLASTIC SHEETING TO HELP PROTECT FROM DUST. B. GYM FLOOR IS TO BE SANDED TO A SMOOTH UNDULATION FREE BARE WOOD SURFACE REMOVING ALL EXISTING PAINT AND FINISH. C. APPLY 2 COATS OF SEALER, SANDING WITH 100 GRIT SCREEN, VACUUM AND TACK BETWEEN COATS. D. SECOND COAT OF SEALER IS TO BE SCREENED AGAIN AND THEN VACUUMED AND TACKED PRIOR TO APPLICATION OF GAME LINES. E. GAME LINES SHALL BE THE SAME FONT AS WHAT IS CURRENTLY AT THE MIDDLE SCHOOL. THE NEW FLOOR SHALL HAVE Basketball and Volleyball Game Lines. F. LINES ARE TO BE STRAIGHT WITH CLEAN EDGES, AND STIPPLE FREE. ALLOW 24 HOURS OF DRYING TIME BEFORE ABRADING PAINTED AREAS WITH 100 GRIT SCREEN, THEN VACUUM AND TACK FLOOR AREA.