Specifications include, but are not limited to: Construction-Manager-at Risk shall perform and coordinate all pre-construction and construction services for the following project as a single package or in multiple combination packages. Project includes temporary electrical generation, heating and cooling where required while permanent components are being replaced. 2.2.1.1 Provide Emergency generators complete w/ foundations, ATS and associated wiring for Buildings 5961, 5962, 633, 634, 635, 636, 645, 646, 647, 648, 664, 649, 501, 510, 637, 638, 639, 640, 597, 652, 669, 670, 671, 672, 673, 674, 675, 676, 592, 591, 659, and 547. Installation shall be complete in all respects, including testing, ready for use. 2.2.1.2 Install new boilers for the laundry, building 656. Boilers to be complete to provide steam for the commercial laundry including all steam piping, vents, condensate unit, and gas piping and all connections for a complete and operational system.