Specifications include, but are not limited to: The closed Gold Creek eastbound (EB) and westbound (WB) rest areas will be converted to truck parking areas.The existing rest rooms, picnic shelters, picnic tables, exhibit cases, trash receptacles, benches, historical markers, sidewalk, and respective concrete slabs and foundations will be removed, and disturbed areas revegetated.The existing waste treatment system will be filled/crushed and abandoned in place. At each location, the following features will be installed: the existing water system will be upgraded with a new well pump, new water line, and a new pressure tank installed inside a buried vault; new sidewalk adjacent to parking area, new sidewalk loop around rest area with access to new picnic tables and new historical signs; new curb and gutter, new double vaulted toilet with maintenance closet, new trash receptacles, new picnic tables (4 per rest area), new picnic benches (2 per rest area), and new lighting. In addition, the parking areas and Interstate on and off-ramps will receive a crack seal, seal and cover, fog seal, and new pavement markings (new striping configurations). Signing will be upgraded in the parking areas and along the Interstate.The project is located along Interstate 90 (I-90) in Powell County, about five miles west of Garrison Junction.The WB rest area is located at RP 167+0.4 and EB rest area is located at RP 169+0.4.