Specifications include, but are not limited to: The City of Fayetteville is accepting package bids from properly licensed and authorized firms for the construction of Township pressure plane improvements in Fayetteville, AR. Work under this Contract includes, but is not limited to, the construction of a new pump station, generator and concrete pad, 250,000-gallon elevated composite water storage tank, installation of 8-inch and 12-inch PVC and DIP water lines, and modifications to existing sewer collection system, sitework including grading, street milling and repaving, removal of trees and stumps, seeding, fencing, testing and disinfections. Work also includes demolition/dismantling and disposal of existing pump station structure and 75,000 waterspheroid tank and all items as set out in the Contract Documents.