Specifications include, but are not limited to: A. Remove all debris from roof surface, gutters, and downspouts. Photograph and document any deficiencies. Immediately notify the CHP Facilities Coordinator of all deficiencies. B. Inspect interior of building for signs of water penetration, frost build-up, and structural distress. Immediately notify the CHP Facilities Coordinator of all deficiencies. C. Inspect exterior of building for continuity of roof covering, deterioration of fascia, gutters, soffits, and performance of flashings. D. Remove accumulations of soil which may support plant life resulting in roof damage. E. Check condition of flat roof surface for blisters and ridges, splits or cracks in the membrane, open end or lap joints in the cap sheet or membrane, exposed felts or deterioration of any component of the roof system. F. Ensure all walk pads to ensure they are in good condition, if not report immediately. G. Check for water ponding more than seventy-two (72) hours after it rains which exceeds 1” in height. H. Check all flashings and/or gravel stops for deterioration, lateral tears or splits, and opening joints. I. Inspect any new penetrations from other trades such as, but not limited to, pipes, Air Conditioning (A/C) units, and satellite dishes.