Specifications include, but are not limited to: 1.1 MATERIALSAll materials shall comply with all applicable building codes for public buildings.All materials shall be compatible with each other. Paint materials shall be code compliant materials to match existing for repainting or touch up ofall surfaces damaged. Color shall be white, matching the existing. Contractor shall include the specification and data sheet of the paint be supplied.Apply two coats of latex paint over an oil based primer underneath. Paint shall be applied according to the specifications provided with the product.1.4 PREPARATIONCarefully examine all wood components for deterioration.Report any deterioration found to the Town.Scrape loose paint back.Surfaces shall be washed and/or roughened if necessary to insure good paint adhesion.Provide caulking where necessary.Repair rot by removing loose material and stabilizing wood with filling/patching; finish sanding where necessary.Prime bare wood.1.5PAINTINGPaint materials shall be code compliant materials tomatch existing for repainting or touch up of all surfaces damaged. Color shall be white, matching the existing.Contractor shall include the specification and data sheet of the paint be supplied.Apply two coats of finish to areas that were primed and one coat to remaining areas.Paint shall be applied according to the specifications provided with the product.