Specifications include, but are not limited to: 1. Excavation of topsoil and subsoil for exercise station pad; 2.Setting up temporary barriers at the entrances to the Dog Park;3.Excavation of compacted stone screening pads at entrances to Dog Park;a.Removed stone screenings shall be stockpiled on-site. BPRW staff will beresponsible for transporting excavated screenings to a final storage location.4. Temporary removal and reinstallation of fence fabric and gates;5.Protection or removal and replacement of fence postsa.Any fence posts damaged or removed as part of the project shall be replaced by thecontractor6.Site grading and layout;7.Installation and compaction of gravel subbase;8. Installation of exposed aggregate concrete pads;a.Includes expansion joints, control joints and concrete sealant9. Installation of topsoil, seed, and mulch on any areas of exposed soil or disturbance.a.Reuse topsoil excavated for the project.b. Mulch with erosion control blanket